Incoming materials
Material acceptance and identification before processing.
SourceLink connects your packaging project with specialized manufacturing resources in China. Our sales team coordinates artwork, material selection, printing, pouch production and export delivery.
Our sales team helps with pouch selection, artwork, material discussions, production planning and international delivery coordination.
The supplied workshop footage shows our manufacturing network in operation. Production specifications, inspection criteria and delivery terms are agreed for each order.
Equipment information supplied for our core partner facility.

20K × 1 · 25K × 1 · 200K × 3
Processes selected for the agreed material structure.
Inspection requirements defined for each order.
Scroll sideways to explore the factory videos.
Our manufacturing partner maintains a dedicated quality department. Quality personnel review materials, print, pouch construction and batch records alongside the production process.
Material acceptance and identification before processing.
Review artwork and printed appearance against the agreed reference.
Check dimensions and sealing against the product specification.
Maintain material, production and inspection records for each batch.
Keep samples and test records for review and follow-up.
Material testing and factory certifications are reviewed for the specific product and destination. Any shared document should identify the issuer, certified entity, scope and validity.
Quality management certification for the production activities and locations listed on the certificate.
Printed valid until8 October 2028
View certificate ↗
A packaging manufacturing standard. The supplied certificate identifies the certified facility, production scope and materials.
Printed valid until7 November 2026
Updated renewal status requires confirmation.
View certificate ↗Partner-facility certificates shown as supplied. Certified entity, scope and printed validity appear on the originals.
These records relate to a manufacturing partner, not SourceLink certification. Original copies identify the certified entity and scope. Current status and project applicability are confirmed before use.
Supplied partner-facility certificate. Printed validity: 8 October 2028. Scope is limited to the activities and locations listed on the original document.
Supplied Issue 7 certificate, issued 21 October 2025. Printed expiry: 7 November 2026. The re-audit window has passed; updated renewal status must be confirmed.
Supplied partner-facility licence for specified food-contact plastic packaging products. Printed validity: 16 December 2030. The original product schedule defines the permitted scope.
Tell us what you’re looking for. We’ll help you explore the right packaging solution.